Quick answer: GSMS Construction Ltd are RC frame contractors working in Kensington and Chelsea. Our own formwork, steel-fixing and concrete teams build basement walls and slabs, retaining walls, lightwells and full concrete frames to your engineer’s design. We plan every job around the council’s strict basement rules, and you get a written price before work starts.
Key takeaways
- Kensington and Chelsea has some of the strictest basement rules in the UK, so the RC contractor needs to plan for them from day one.
- Policy CL7 limits basements to 50% of the garden and one storey on most sites, with one metre of soil above any part under a garden.
- The council’s Code of Construction Practice sets tight hours, noise limits and an approval process that takes at least eight weeks.
- Basements almost always trigger the Party Wall etc. Act 1996, so notices go out at least one month before excavation.
- We bring our own formwork and concrete teams, which keeps the RC package under one contractor.
What do RC frame contractors in Kensington build?
RC stands for reinforced concrete: steel bars fixed inside timber or system formwork, then filled with concrete. In Kensington, most RC work happens below ground, because planning rules and conservation areas make it hard to build up or out. So digging down is often the only way to add space.
That means basement boxes under terraced and semi-detached houses, retaining walls for lightwells and sunken courtyards, new ground-floor and transfer slabs, and full concrete frames where an old building is replaced. On commercial and mixed-use schemes, it also covers cores, columns and podium decks.

Services from our RC frame contractors in Kensington
| Service | Best for | What’s included |
|---|---|---|
| Basement RC walls and slabs | New basements under houses and gardens | Formwork, steel fixing and concrete to the engineer’s design and sequence |
| Retaining walls and lightwells | Rear lightwells, sunken courtyards, garden levels | RC walls, kickers, drainage provision for the waterproofing system |
| RC frames and transfer slabs | Rebuilds, small blocks of flats, mixed-use schemes | Columns, walls, cores, flat slabs and podium decks |
| Basement construction support | Homeowners and main contractors | Excavation, spoil removal and the RC shell, coordinated with your engineer |
| Concrete work | Ground-bearing slabs, bases and pads | Formwork, mesh, pour and finish |
| Micro diggers and dumpers with drivers | Tight-access digs | Micro and mini diggers, tracked dumpers and experienced drivers |
Where our RC frame contractors in Kensington work
We work across the Royal Borough of Kensington and Chelsea and the boroughs around it:
- Kensington W8 and South Kensington SW7
- Earl’s Court SW5 and West Brompton SW10
- Chelsea SW3 and SW10
- Notting Hill and Holland Park W11, plus West Kensington W14
- Nearby: Fulham SW6, Hammersmith W6 and the rest of central and London, with Surrey to the south
Also, most homes here are Victorian and Edwardian terraces, stucco villas and mansion blocks on tight plots. Many sit in conservation areas, and almost all of them share walls with neighbours, so every dig needs careful sequencing and propping.
Kensington basement rules RC frame contractors must follow
The council’s basements planning policy (CL7) sets the limits. A basement in the borough must:
- take up no more than 50% of each garden or open part of the site, with the rest kept in one area;
- be no more than one storey, except on some large sites;
- avoid digging under a listed building, including its vaults;
- keep at least one metre of soil above any part that sits beneath a garden;
- include a sustainable drainage system (SuDS), kept in place for the life of the building;
- avoid new front or side lightwells and railings where they would harm the street.
An Article 4 direction means basements under the footprint of a house also need planning permission. The council expects a construction method statement from a qualified civil or structural engineer with the application, plus a draft construction traffic management plan that neighbours have seen.
The Code of Construction Practice
The council’s Code of Construction Practice treats basement excavation as a Category 1 site. You need a signed checklist and a site construction management plan approved before work starts, and the council asks you to allow at least eight weeks for that. Other key points:
- Noisy work: 8am to 6pm, Monday to Friday only.
- High-impact work, such as breaking out concrete: 9am to 12 noon and 2pm to 5.30pm on weekdays.
- Noise monitoring on Category 1 sites, with a 70 dB limit over the working day at the nearest homes.
- At least two weeks’ notice to neighbours before work starts.
So the concrete programme has to fit those hours. We plan pours, pump bookings and deliveries around them from the start, rather than finding out on site.
Party Wall etc. Act 1996
Under section 6 of the Party Wall etc. Act 1996, you must serve notice if you dig within 3 metres of a neighbour’s building below its foundations, or within 6 metres where the dig cuts a 45-degree line down from them. Notice goes out at least one month before excavation. In a Kensington terrace, a basement almost always triggers this.

Building outside RBKC? Read our guide to basement construction in Croydon.
Ground, water and waterproofing
London Clay dominates the ground north of the Thames, as the London Geodiversity Partnership notes, and that includes most of Kensington. It holds its shape well when dug, but it swells and shrinks with water and tree roots, and pockets of gravel or perched water can turn up. So the engineer needs trial pits or boreholes before the design is fixed.
Above all, water is the biggest long-term risk in any basement. The waterproofing design usually follows BS 8102 and combines water-resisting concrete, a cavity drain membrane and pumped drainage. We build the concrete to that design and leave the right kickers, joints and channels, so the waterproofing specialist can do their part properly.
Getting concrete and spoil in and out of a Kensington street
Because of narrow streets, resident parking and neighbours on both sides, logistics are often the hardest part of a job here. Before we start, we plan:
- where the concrete pump stands, and how far the boom has to reach;
- parking bay suspensions and any licences for skips, hoardings or scaffolding on the road;
- conveyors and grab lorries to move spoil out through the front of the house;
- delivery slots that fit the approved traffic plan and working hours.

How much do RC frame contractors in Kensington charge?
We price every job from the engineer’s drawings and a site visit. As a starting point, Checkatrade’s basement cost guide gives these UK figures:
| Item | Typical UK price | Source |
|---|---|---|
| New basement with underpinning | £2,000 to £3,000 per m² | Checkatrade |
| Basement under a garden | £1,500 to £2,000 per m² | Checkatrade |
| Lowering an existing cellar floor | £1,500 to £2,000 per m² | Checkatrade |
| Structural engineer | From about £1,500 to £2,000, plus a percentage | Checkatrade |
| Party wall agreement | About £700 per neighbour | Checkatrade |
Prime central London sites usually cost more because of access, monitoring, approvals and working-hour limits. Even so, the RC package is easier to control when one team does the formwork, steel and concrete. We give you a fixed written price for our part before anything starts.
How long does the work take?
First of all, approvals often take longer than the build itself. Allow several months for design, planning, the party wall process and the council’s eight-week construction plan approval. On site, a single-storey basement under a terraced house usually takes a few months from first dig to finished shell, depending on size, access and how many bays the engineer specifies.
How to choose RC frame contractors in Kensington
- They have their own formwork and concrete teams, not just labour on hire.
- They work to your engineer’s sequence and temporary works design, and they ask questions when something doesn’t add up.
- They know the council’s basement policy, the Code of Construction Practice and the party wall process.
- They plan pumps, deliveries and spoil around tight streets and approved hours.
- They hold full insurance and show you the certificates.
- They can show photos of real RC work and point you to their Google reviews.
Projects we take on
We build basement shells, retaining walls, ground-floor and transfer slabs, and RC frames for homeowners, main contractors and developers. Our teams have poured large slabs and multi-storey frames on London sites, and the photos on this page come from our own jobs.
Still, we don’t publish customers’ addresses. Instead, ask us for photos of similar jobs, and see our portfolio and Google reviews.

Why choose GSMS as your RC frame contractors in Kensington
- Own formwork, steel-fixing and concrete teams, so no hand-offs between trades.
- Groundworks and plant in-house: micro and mini diggers and dumpers with drivers.
- Free site visit and a fixed written price for our package.
- 10-year workmanship guarantee and full insurance.
Our process
- Send the drawings: the engineer’s drawings, or tell us about the project.
- Site visit: we check access, pump positions and spoil routes.
- Written price: a fixed price for the RC package, with a clear programme.
- Pre-start: we fit our programme to the approved construction plan and party wall awards.
- Build: formwork, steel and concrete in the engineer’s sequence, with inspections at each stage.
- Hand-over: a finished RC shell, ready for waterproofing and fit-out.
RC frame contractors in Kensington: FAQs
Do I need planning permission for a basement in Kensington?
In almost every case, yes. The Royal Borough of Kensington and Chelsea uses an Article 4 direction, so even a basement under the footprint of the house now needs planning permission. The council also expects a construction method statement from a structural engineer and a draft construction traffic plan with the application.
Can I build a basement under my garden in Kensington?
Yes, within limits. Policy CL7 says a basement can take up no more than 50% of each garden, must be a single storey on most sites, and needs at least one metre of soil above any part that sits under the garden. It also must include a sustainable drainage system.
What hours can basement work happen in Kensington and Chelsea?
The council’s Code of Construction Practice allows noisy work from 8am to 6pm, Monday to Friday, with none at weekends or on bank holidays. High-impact work, such as breaking out concrete or percussive piling, is limited to 9am to 12 noon and 2pm to 5.30pm on weekdays.
Are RC frame contractors in Kensington responsible for waterproofing?
We build the concrete walls and slabs to the engineer’s design, including any water-resisting concrete they specify. The full waterproofing design to BS 8102 normally comes from a specialist, and we work alongside them, so joints, kickers and drainage channels line up with their system.
How much does an RC basement cost in Kensington?
Checkatrade’s UK guide puts a new basement with underpinning at £2,000 to £3,000 per m², and prime London sites usually cost more because of access, approvals and monitoring. We price the RC package in writing once we have the engineer’s drawings and have seen the site.
Do I need a Party Wall agreement for a basement?
Almost certainly. Section 6 of the Party Wall etc. Act 1996 covers digging within 3 metres of a neighbour’s building below its foundations, or within 6 metres where the dig cuts a 45-degree line from them. You must serve notice at least one month before excavation starts.
Do you build RC frames for flats and commercial schemes in Kensington?
Yes. Besides basements under houses, our formwork and concrete teams build RC frames, transfer slabs, cores and podium decks for small blocks of flats, mixed-use schemes and commercial refurbishments. Send us the drawings and the programme, and we will price the frame package.